Back

IRS/2024/3975/PON1

Notification details

Status In review
First observed date 02 January 2024
First observed time 01:01
Incident type(s) Chemical release
Organisations involved ITHACA ENERGY (UK) LIMITED
Installation Captain WPP'A'
Installation type Production installation (including any connected infrastructure)
Field CAPTAIN
Latitude 58° 17' 57.0'' N
Longitude 1° 46' 40.0'' E
Quadrant / block no. 13 / 22

Formal investigation

Formal investigation ever opened No